Tears were shed. By me. Not for the first time during our project, but for the first time because of our project. And not due to frustration or anxiety, although I’ve felt plenty of those emotions as well.

In our latest project hurdle, we took the first steps of requesting a draw from our progressive mortgage provider. Having hustled and fanangled to get our mortgage approved in the first place, all the hard work on the financing front was now done, right?

Wrong. Good luck getting access to those funds when you need them. We’ve learned that a common problem is that a project’s first draw is likely to be insufficient. Bank appraisers apply a very standard formula for determining progress and hence the amount of the loan they will release. For instance, below grade work is often assessed at 11% of the total project value. So regardless of what you’ve actually spent to reach that point, they will only release 11% of the total loan amount. They also assign zero value to demolition, hazmat and deconstruction costs. So never mind all that careful upfront work. And never mind that we have also wrapped everything below grade in 6″ of insulation. This only adds to the discrepancy between the formula and the real world.

But even that is not the real kick in the pants. The most unpleasant complication is our discovery that the bank assigned a fairly high percentage of our project value to the existing structure. Remember that lovely little box that we ended up deconstructing and whose component parts are now piled up under tarps? Those parts are worth nothing in the bank’s eyes in their disassembled state. Less than nothing in fact.

It doesn’t matter that deconstructing and rebuilding is financially better for the project. Something about a hole in the ground makes banks really nervous about their investment risk. Until we’ve at least surpassed the point of construction that the bank thinks we started with – walls, roof, floors – we don’t even want their appraiser to see the project.

What this all means is that we have to effectively get to lock-up – walls, roofs, windows, doors all installed – before we even call the bank. Yet Interactive and their sub-trades have done a ton of work until now and it’s only fair that they be paid.

Nope, no tears yet. Just that ball of anxiety settling into my gut and haunting my early morning dreams while Matt and I ran through all the possible scenarios. One thing was clear: we needed to bridge a significant shortfall of cash in the very short-term. I had known, or at least suspected,  that we’d have a shortfall (it’s surprisingly hard to pin down all the little things like architect fees, city fees, legal fees etc), but I’d hoped we could push it to the very end and squeak by on our lines of credit.

Our options to bridge this shortfall included family loans, additional lines of credit (how many of these things can one person get anyway?), and high interest private loans. The latter would surely sink us and our project with minimum 10% interest plus several more percents in fees. A low-interest family or friend loan would be ideal but neither of us has immediate family or friends with such means. We’d have to branch out further. Matt bought a lottery ticket for good measure; then we assembled a small list and started making calls.

We all have patterning we’ve learned from childhood traumas big and small. Part of growing as an adult is recognizing and breaking those patterns. My learned assumption was that I couldn’t count on others, so I’d approached many past challenges in terms of what I could accomplish entirely on my own. I’d do everything I could to avoid finding myself in that vulnerable position of needing help – especially financial help.

I am learning. While I’ve long wanted to do a project like this, I wouldn’t have started without having Matt as a partner, supporting me, challenging me with his worst case scenarios, and making all the big decisions with me. It turns out I can solve almost any problem if I can talk it through with someone I trust.

Making those phone calls was extremely difficult for me. But I couldn’t let this project fail and we would get zero help if we didn’t ask. So when my extended family responded quickly and supportively (thanking me for the opportunity to help! Am I the only one who finds this exceptional?), I had to further dismantle those old beliefs that I don’t need help and that others won’t help.

Queue the tears. They were tears of gratitude, relief and hope and I couldn’t contain them. They just poured out. Yet another unexpected gift from our project. It’s given us an incredibly generous and engaged community, built friendships, and shown us what we can accomplish with the support of others. And it’s proven that when you aim a little bigger, it gets pretty hard to do it all on your own.

So…

Thank you! Thank you all!

Share this:

  • Click to share on X (Opens in new window) X
  • Click to share on Facebook (Opens in new window) Facebook

Filed Under: Financing

Comments

  1. Sean WIens says

    December 1, 2018 at 1:29 am

    I feel for you and can highly empathize. Project Financing was the number 1 stress for me on theEnclosure.ca for most of the first 4 years of my build. It sucks the joy out of everything and consumes time, energy, and emotion that is needed for more important construction taks. And the appraisal community just is not up to speed and really do not understand high performance home costs. I dreaded the quarterly appraisal visit! But it is strange that you are not being given a larger percentage up front. Most lenders advance 40% of the land value on the first draw regardless of the costs to date to get to foundation stage (point that most will make first draw available). You may want to look at a new lender. My experience is if it is messed up now, at the beginning, it will only get worse. The BMO came to the rescue on my project at the 4 year mark. They gave me a very competitive rate (below prime) and even provide % only payments for the first year. My contact was Rajinder Chaudhary – BMO Financial Services Manager at the head branch 595 Burrard St, Vancouver (604) 665-7342. You could mention my name if you do contact him. He was a life saver and very easy to deal with.

    Reply
  2. clove says

    December 19, 2018 at 4:12 am

    Hi Sean – thanks so much for the tip – and for sharing your blog (the quotes about tough people and determination are timely!). Looks like you are getting close to completion on your 4-year project – congratulations!

    We did get an initial draw for 65% of the land value plus a percentage of the project value that was assigned to the existing structure. However, most of those funds went toward paying off the existing mortgage.

    Reply
    • Sean WIens says

      December 19, 2018 at 6:47 am

      Ah, that makes more sense. I wish you all the best on your build. I can attest first hand at the stresses doing something ‘different’. Keep the faith!.

      Reply
      • clove says

        December 22, 2018 at 8:02 pm

        Thanks Sean! Happy Holidays to you. Are you close to moving in to your new place?

        Reply
        • Sean Wiens says

          December 24, 2018 at 5:51 pm

          No, I have a lot left to do. Looking at late summer 2019. Still have plumbing supply, electrical, heating, interior insulation, and all finishing. Merry Christmas to you as well.

          Reply

Leave a Reply to Sean Wiens Cancel reply

Your email address will not be published. Required fields are marked *

Who is Stretch Developer?

Stretch Developer is written by Christy Love. In partnership with my husband Matt, we are challenging ourselves to create the kind of homes we want to live in and see more of in our community. Home is the incredible Victoria, BC, Canada.

Sign up!

Sign up to receive email notifications of new posts.

Recent Posts

  • New Uses for Old Wood Part 2 September 26, 2021
  • Ongoing Preparations for the Apocalypse August 13, 2021
  • Things We’ve Noticed – Energy Edition May 29, 2021
  • Passive House Suite for Rent April 17, 2021
  • Things We’ve Noticed – Comfort Edition March 14, 2021

Blogs We Like

Green Building Advisor Blogs

Musings of an Energy Nerd

Treehugger

Talk to ARYZE

Recent Posts

  • New Uses for Old Wood Part 2
  • Ongoing Preparations for the Apocalypse
  • Things We’ve Noticed – Energy Edition
  • Passive House Suite for Rent
  • Things We’ve Noticed – Comfort Edition
  • New Uses for Old Wood Part 1

Tags

budget building permit cabinet construction climate action climate change community engagement construction deep energy retrofit design design progress development permit duplex duplex + suite energy consumption energy efficient design financing financing passive house finding land food security home inspections infill low energy design neighbourhood engagement net zero passive house Passive House comfort Passive House construction Passive House construction costs passive house for sale Passive House performance Passive House performance; Sanden CO2 heat pump Passive House rental Passive House systems passive house testing performance pro forma property search tips reclaimed wood reclaimed wood construction rezoning roof row house small lot development small lot subdivision ultra low energy

Copyright © 2025 · Metro Pro Theme on Genesis Framework · WordPress · Log in