How Much We’ve Spent So Far

December 8, 2017 by clove 4 Comments

We have arrived at our first moment of financial reckoning. I’d budgeted $30,000 of self-financed work to get us through rezoning.

Here’s what we’ve actually spent:

  • Building & Landscape Design: $14,000. This includes two early concepts and a redesign; a full set of architectural drawings suitable for rezoning, plus Landscape Plan.
  • City Fees and Associated Costs: $4,500. This includes the rezoning application fee, the public hearing fee, plus a lot of printing – $787 worth of paper and signage! Forgive us, trees.
  • Site Survey: $1,350. Required for the application, as well as for our architect Mark A to create the Site Plan
  • Tree Preservation Plan: $500. Required for the application, completed by an arborist.
  • Existing House Stuff: $1,900. Includes hazardous materials survey so we don’t unwittingly poison anyone, plus a fee to get rid of our above-ground oil tank. Good riddance!

Total spent through approval of rezoning = $22,500

So, we are currently under budget for the items I had accounted for – woo, party!

Hold the phone, don’t send the invitations out just yet. There are a few asterisks and things I plain neglected in that innocent early budget.

The biggest of my omissions is the Building Permit fee at 1.25% of the construction budget. I’d thought somehow that this fee would be much smaller. Russ our builder is working on the budget as I type, but with my current, ever-escalating working number, we are looking at $11,000-$12,000. Half is due when we apply for our permit and the other half is due when we pick it up.

A few others:

  • Landscape Deposit – this one was a surprise. It’s required of any project that needs a Development Permit (determined based on location of the project from what I understand), and is equivalent to 120% of your landscape budget. Ouch. It’s a way for the City to ensure we follow through and finish up the landscaping. We’ll get the deposit back, but it hurts to have to come up with this at the front end.
  • Design package for Building Permit. The design drawings need to be fleshed out in more detail for our Building Permit application and for construction.
  • Builder Deposit. This goes toward actual construction costs, and provides assurance to Russ before he starts ordering stuff for our project. A reasonable expectation, but something that must be planned for.

For the sake of completeness, there are also some items that I handled myself but would have a real cost if we hired someone else to do them:

  • My general project development time, which I did not record consistently enough to provide a meaningful total (perhaps better not to know?). Let’s just say a lot of hours – planning the concept, coordinating with the team, consulting with neighbours, coordinating with the city, putting together presentations etc.
  • Passive House modeling costs. So far, I’ve spent 45 hours on the model. This includes a fair chunk of learning time, reworking, and remembering what I’d done when I put the model aside and came back to it several months later. The model still needs to be updated before we start construction, again after we change anything significant, and then finalized after construction is complete. As the project Passive House Consultant, I will also need to document the construction to show that we built what we modeled. Actual certification requires that we hire someone independent who is qualified, and we’re expecting to spend $5,000 for this piece.

So, overall we are doing OK budget-wise. We are not completely blowing the budget, but I missed a couple of key items in my first pass. This is nothing if not a learning process after all!

We’re working on financing now, so we hope to answer very soon whether this is all going to fly – stay tuned and thanks for reading!

Share this:

  • Click to share on X (Opens in new window) X
  • Click to share on Facebook (Opens in new window) Facebook

Filed Under: Financing Tagged With: budget, financing, infill, passive house

Comments

  1. Cameron Maltby says

    December 9, 2017 at 1:32 am

    Will there be any service fees from the city for new sidewalks, curbs, lane paving, storm and sanitary sewer, domestic water upgrades, etc.? Any fees from BC Hydro, Terasen or other utilities? These are all the ones that threw us for a loop at the beginning of our project.

    Reply
    • clove says

      January 13, 2018 at 6:46 pm

      Hi Cam – yes, there will be city fees for new water, storm and sewer services. Likely BC Hydro too. I’ve asked our credit union if they will provide an early draw to cover some of that, but that remains to be seen!

      Reply
  2. Walker Cliff says

    December 9, 2017 at 7:07 pm

    I have been a design/build guy since 1978.
    I was there during the first go round of energy efficient buildings and the granddaddy of them all starting in Saskatchewan and the beginnings of the R 2000 program.
    Born in 54 I was part of the anti establishment movement and reclaim the commons.
    It is sad to see that it has completely failed.
    The democratic free world is unfathomly more expensive than anyone in 1972 could ever have imagine. George Orwell predicted the bureaucratic nightmare we have now.
    Participating in a dream of building your own home whether hands on, or collaborating with professionals, is only within the financial ability of the upper middle class and above.
    Inclusiveness is the only way forward, not exclusiveness.
    Your experience, is what I have seen, all the more common starting in the 90’s.
    It makes me despair for our democracy.
    Those of privilege are all too complicit.

    Reply
    • clove says

      January 13, 2018 at 6:52 pm

      Hi Cliff. Wow, you were there to develop the Saskatchewan house – impressive!
      I agree that this type of project is out of reach for many. I’m of mixed feelings about the rezoning and development permit process and associated costs (which we would not have had to do if we were only building our dream home, and not one for another family as well) – Victoria has preserved a lot of his historic beauty due to resistance to development and the persistent voices of key influencers to keep that heritage. Some checks and balances are good, but I would also like to see more support, incentives, and/or tax breaks for going above and beyond. I’ve heard murmurings from the federal and provincial governments, but so far we are doing all of this on our own dime in the hopes of a reasonable return.

      Reply

Leave a Reply to clove Cancel reply

Your email address will not be published. Required fields are marked *

Who is Stretch Developer?

Stretch Developer is written by Christy Love. In partnership with my husband Matt, we are challenging ourselves to create the kind of homes we want to live in and see more of in our community. Home is the incredible Victoria, BC, Canada.

Sign up!

Sign up to receive email notifications of new posts.

Recent Posts

  • New Uses for Old Wood Part 2 September 26, 2021
  • Ongoing Preparations for the Apocalypse August 13, 2021
  • Things We’ve Noticed – Energy Edition May 29, 2021
  • Passive House Suite for Rent April 17, 2021
  • Things We’ve Noticed – Comfort Edition March 14, 2021

Blogs We Like

Green Building Advisor Blogs

Musings of an Energy Nerd

Treehugger

Talk to ARYZE

Recent Posts

  • New Uses for Old Wood Part 2
  • Ongoing Preparations for the Apocalypse
  • Things We’ve Noticed – Energy Edition
  • Passive House Suite for Rent
  • Things We’ve Noticed – Comfort Edition
  • New Uses for Old Wood Part 1

Tags

budget building permit cabinet construction climate action climate change community engagement construction deep energy retrofit design design progress development permit duplex duplex + suite energy consumption energy efficient design financing financing passive house finding land food security home inspections infill low energy design neighbourhood engagement net zero passive house Passive House comfort Passive House construction Passive House construction costs passive house for sale Passive House performance Passive House performance; Sanden CO2 heat pump Passive House rental Passive House systems passive house testing performance pro forma property search tips reclaimed wood reclaimed wood construction rezoning roof row house small lot development small lot subdivision ultra low energy

Copyright © 2025 · Metro Pro Theme on Genesis Framework · WordPress · Log in